Maintenance & Contracts

Having a planned preventative maintenance (PPM) can prevent the risk of breakdowns, confirm the equipment is safe to use and gives you peace of mind systems are in efficient working order. We recommend LEV equipment should be serviced at least every 12-months and more frequently if usage is high.

At DevineAir we have a dedicated maintenance team who work with some of the biggest companies across UK and Ireland. Implementing a maintenance programme means you don’t have to worry about scheduling your next assessment or the cost of ongoing remedial work. We develop a programme to ensure your LEV system is constantly working to its optimum.

 

Worker doing maintenance on machines

Maintenance include:

check element
Identifying all required LEV maintenance tasks and their frequency.
check element
Development of maintenance schedules & programmes
check element
Undertaking maintenance tasks such as filter changing, replacement of consumables, airflow indicator calibration etc.
check element
Acquiring / producing LEV logbooks & user manuals (recommended by HSG258), which are often neglected or missing altogether.
check element
Providing onsite training / toolbox talks to operators and local area managers on safe and optimum LEV usage / operator interaction
check element
Design and erection of warning signage e.g. maximum capture distances, system limitations, smoke clearance times etc.
check element
Overview of LEV Installation projects & managing sub-contractors

Industries that we work with include:

Cropped elements
WHAT OUR CLIENTS SAY

Testimonials

We work to achieve and maintain compliance resulting in a much safer working environment for our clients and their staff.

Contact Our Teamsoft glow cropped elementsmall image transparent png
menu